- Section Includes: Material and labor requirements for Post tensioned concrete unit masonry construction using the IntegraŽ Wall System.
- Products Furnished But Not Installed Under This Section:
- Section 03300 - Cast-In-Place Concrete: Installation of anchor bolts.
- Products Installed But Not Furnished Under This Section:
- Section 04100 - Mortar and Grout.
- Section 04150 - Masonry Accessories.
- Section 04160 - Masonry Reinforcement.
Section 04220 - Concrete Unit Masonry must be included in the project manual since it is referenced in this specification.
- Related Sections:
- Section 04220 - Concrete Unit Masonry.
- Section 04228 - Ground Faced or Burnished Masonry Units.
- Section 04255 - Custom Pre Glazed Concrete Masonry Units.
- Section 04270 - Glass Block Masonry Units.
Edit the listing of standards, including the Code having jurisdiction, to those which are applicable to the project. Copies of these standards are available from Superlite.
- American Concrete Institute (ACI) 530.1 Specifications for Masonry Structures.
- American Society for Testing and Materials (ASTM):
- C 90 - Standard Specification for Hollow Load Bearing Concrete Masonry Units.
- C 140 - Method of Sampling and Testing Concrete Masonry Units.
- 1997 Uniform Building Code (UBC) Standards:
- Standard 21-4-Hollow and Solid Load bearing Concrete Masonry Units.
- Standard 21-17-Test Method for Compressive Strength of Masonry Prisms.
- International Building Code 2000 - Chapter 21
- Section 2105 - Quality Assurance
- ICBO ES Report 4845P - Current or most recent revision
- The post tension masonry wall system shall be the IntegraŽ Wall System, an engineered, post tensioned block wall system.
- Samples: In accordance with Section 04220 - Concrete Masonry Units.
- Submittals to Building Official: In accordance with ICBO ES Evaluation Report ER 4845 P.
- Standards, Regulatory Requirements and Mock Ups: In accordance with Section 04220 - Concrete Masonry Units.
- Design and Construction: Conform to the requirements of ICBO ES Evaluation Report ER 4845 P including special inspection requirements and submittals of IntegraŽ Wall System Application Manual to Building Official.
- Pre Installation Conference: The purposes of this conference are:
- To review the specifications, materials lists, drawings, and material application requirements.
- To verify that all parties understand the meaning and intent of the contract documents.
- Attendees: As designated by Architect
- See also Section 01200 Project Meetings.
- In accordance with Section 04220 Concrete Units Masonry.
- Environmental Requirements: In accordance with Section 04220 Concrete Units Masonry.
PART 2 PRODUCTS
2.01 MANUFACTURERS
- IntegraŽ Masonry Units and related materials shall be as manufactured or distributed by Superlite Block, 4150 West Turney, Avenue, Phoenix, AZ 85019; phone (602)352 3500, (800)366-7877; fax (602)352-0101; or their appointed licensee.
- Masonry Units:
- UBC Standard 21-4 Type I except that minimum 28 day compressive strength on the net area shall be 3000 psi (21 MPa) as determined by ASTM C 140
Mortar and Grout specifications shall conform to the requirements of the ICBO Evaluation Report.
- Sizes and Shapes: As indicated on drawings.
- Other specially molded units shall be supplied by the manufacturer when required or as shown on Drawings.
- Mortar and Grout: In accordance with Section 04100.
- Steel: Post tensioned rods, bottom anchor bolt, top nut and bottom coupler, washers and top steel plates shall be in accordance with ICBO ES Evaluation Report ER 4845 P.
- Direct Tension Indicator (DTI) Washers: In accordance with ICBO ES Evaluation Report ER 4845 P.
- Polyurethane Foam Insulation: In accordance with ICBO ES Evaluation Report ER 4845 P.
- Control Joints, Strap Anchors, Wall Ties, Through Wall Flashing, Weep Holes, Cavity Vents: See Section 04150.
- Horizontal and Vertical Reinforcing: See Section 04160.
- Steel Lintels: As indicated or scheduled on structural drawings.
PART 3 EXECUTION
3.01 ERECTION, INSTALLATION, APPLICATION
- General Requirements for Concrete Masonry Walls: See Section 04220 Concrete Units Masonry for other general requirements.
- Bonding:
- Bond pattern shall be regular running bond with fully mortared head and bed joints.
- Bond shall be plumb throughout face of wall.
- Wall Intersections: In accordance with Section 04220 - Concrete Masonry Units.
- Mortar Joints: In accordance with Section 04220 - Concrete Masonry Units.
- Control Joints:
- Provide control joints at locations indicated.
- Construct control joints as detailed on drawings.
- Horizontal Joint Reinforcing: As indicated on the wall system design drawings and in accordance with Section 2106 of the U.B.C. , or Section 2106 of the International Building Code 2000.
- Vertical Reinforcing:
- Anchor bolts and reinforcing bars shall be installed in accordance with IntegraŽ Wall System engineering specifications and approved drawings.
- Post tensioning: In accordance with ICBO ES Evaluation Report ER 4845 P.
- Bond Beam Reinforcing: In accordance with Section 04220 - Concrete Units Masonry.
- Grouting: In accordance with Section 04220 - Concrete Units Masonry.
- Provisions for Other Trades and Built in Items:
- Built in items required and indicated, including; but not limited to, reinforcing steel, anchors, flashing, sleeves, frames, structural steel, loose lintels, anchor bolts, nailing blocks, door and window frames and miscellaneous iron.
- Enclosures for pipes, stacks, ducts and conduits: Construct slots, chases, cavities, and similar spaces as required, or as indicated on the drawings.
- Insulation: Fill open block cavities in exterior masonry walls with polyurethane foam insulation in accordance with IntegraŽ Wall System Application Manual.
- Tolerances: In accordance with ACI 530.1/ASCE 6, current editions.
- Inspections: In accordance with ICBO ES Evaluation Report ER4845 P.
- In accordance with Section 04220 Concrete Units Masonry.
- In accordance with Section 04220 Concrete Units Masonry
- Furnish temporary protection for exposed masonry corners subject to injury.
- Carefully cover tops of walls left incomplete at conclusion of day's work with tarpaulins or other approved covering.